Installer Final Checklist

 

 

General

  • Placement of Unit.
  • Specified clearance maintained to cabinet surfaces.
  • Unit Level- front to back, side to side.
  • All packaging material and tie straps removed.

 

Electrical

  • Receptacle with 15 ampere circuit protection is provided for service cord connection.
  • Adequate ground connection.

 

Gas Supply

  • Connection: 1/2” NPT flex line with a minimum 5/8” diameter.
  • The pressure regulator which is connected to the manifold is set for 4.0” W.C. for Natural Gas or 10” W.C. for LP.
  • Manual gas shut-off valve installed in an accessible location.
  • Unit tested and free of gas leaks.

 

Operation

  • All internal packing materials are removed, ie below grates, around knobs, etc.
  • Knobs turn freely and correctly.
  • Each burner lights satisfactorily, both individually and with other burners operating.
  • Low flame operation verified.
  • All burner caps, burner rings and burner bases correctly seated in position, level, and do not rock or slide.
  • Burner grates correctly positioned, level, and do not rock.

 

 

 

 