Skip to main content
Fisher & Paykel Product Help

Installation Instructions

Contents of Packaging

Screen Shot 2018-01-04 at 9.12.49 AM.png
Ventilation hood (1)

Screen Shot 2018-01-04 at 9.16.18 AM.png
Installation instructions User guide manual (1)

Screen Shot 2018-01-04 at 9.18.20 AM.png
Chimney (1)

Screen Shot 2018-01-04 at 9.18.56 AM.png
Upper chimney (1)

Screen Shot 2018-01-04 at 9.19.42 AM.png
Upper chimney bracket (1)

Screen Shot 2018-01-04 at 9.19.58 AM.png
Chimney bracket (1)

Screen Shot 2018-01-04 at 9.20.28 AM.png
Power connection box (1)

Screen Shot 2018-01-04 at 9.21.07 AM.png
6” (152 mm) diameter Ducting adapter with back draft damper (1)

Screen Shot 2018-01-04 at 9.21.42 AM.png
1 3/16” (30 mm) Expansion plug (10)

Screen Shot 2018-01-04 at 9.22.18 AM.png
1 3/16” (30 mm)
Self tapping screw (10)

Screen Shot 2018-01-04 at 9.22.51 AM.png
13/32” (10 mm) Self tapping screw (4)

Screen Shot 2018-01-04 at 9.25.21 AM.png
13/32” (10 mm) Screw (2)

Screen Shot 2018-01-04 at 9.23.39 AM.png
1 23/32” (44 mm) Drywall expansion plug (8)

 

Product Dimensions

PD1.JPG

PD2.JPG PD3.JPG
PD4.JPG

 

PRODUCT DIMENSIONS

HC24PHTX1
inches (mm)

HC30PHTX1
inches (mm)

HC36PHTX1
inches (mm)

A. Min overall height of product

25 25/32” (655) 25 25/32” (655) 25 25/32” (655)

A. Max overall height of product

43 1/16” (1094) 43 1/16” (1094) 43 1/16” (1094)

B. Overall width of product

23 17/32” (598) 29 23/32” (755) 35 11/32” (898)

C. Overall depth of product

19 11/16” (500) 19 11/16” (500) 19 11/16” (500)

D. Height of product

4 1/2” (114) 4 1/2” (114) 4 1/2” (114)

E. Width of chimney

12 19/32” (320) 12 19/32” (320) 12 19/32” (320)

F. Depth of chimney

11 13/32” (290) 11 13/32” (290) 11 13/32” (290)

G. Distance from center of ducting outlet to back of product

3 3/4” (95) 3 3/4” (95) 3 3/4” (95)

H. Distance from center of ducting outlet to side of chimney

6 5/16” (160) 6 5/16” (160) 6 5/16” (160)

I. Diameter of ducting outlet

5 29/32” (150) 5 29/32” (150) 5 29/32” (150)

J. Distance between center of lights

16 1/4” (413) 16 1/4” (413) 16 1/4” (413)

K. Distance between center of lights and back of product

1 21/32” (42) 1 21/32” (42) 1 21/32” (42)

Actual product dimensions may vary by ± 3/32” (2 mm).

Height of Ventilation Hood

Screen Shot 2018-01-04 at 9.43.10 AM.png

Installation Dimensions inches (mm)

L. Installation height

Ducted

Recirculation

 

min. 26 25/32” – max. 43 1/16” (min. 680 – max. 1094)

min. 29 ” – max. 43 1/16” (min. 740 – max. 1094)

M. Height top of cooktop to base of product

min. 26” – max. 30” (min. 660 – max. 762)min. 26” – max. 30” (min. 660 – max. 762)min. 26 ” – max. 30 1/16” (min. 660 – max. 762)

Ventilation hood installation height above the cooktop is the user’s preference. Lower installation heights will improve the efficiency of capturing cooking odors, grease, and smoke. This ventilation hood must be installed between the minimum and maximum dimensions indicated in the table above.

To reduce the risk of fire, use only metal ductwork. Do not use flexible plastic ducting

To reduce risk of fire and to properly exhaust air, be sure to duct air outside – do not vent exhaust air into spaces within walls or ceilings or into attics, crawl spaces, or garages.

Venting Options

Attention should be given to ensure that any applicable regulations concerning the discharge of exhaust air are fulfilled.

The ventilation hood can be installed to operate with the exhaust air ducted externally from the kitchen, or installed to operate with the exhaust air recirculating within the kitchen.

Ducted

For ducted installation it is recommended that 6” (152 mm) diameter, rigid or semi-rigid ducting is used. This will require a 6 5/16” (160 mm) (min) round hole in the ceiling or wall. Care should be taken to position the hole correctly.

For optimal efficiency use the shortest and straightest duct route possible and use rigid or semi-rigid ducting for reduced noise and increased airflow. Flexible metal ducting should only be used as a last resort (ie in difficult installations) and if used ensure that it is straight and smooth and extended as much as possible.

Recirculating

To enable the product to operate with the air recirculating, please purchase a recirculation diverter and carbon filters (refer to the ‘Parts and accessories’ section). This recirculation diverter is required to channel the air out the side vents at the top of the chimney and the carbon filters are required to remove odors.

A ducting hole is not required in the wall or ceiling if the ventilation hood is installed to operate with exhaust air recirculating.

  • This product is heavy and requires two persons for installation.

  • Installation work and electrical wiring must be done by qualified person(s) in accordance with all applicable codes and standards.

Wear gloves to protect against sharp edges.

The manufacturer is not liable for any damage caused by not following these instructions.

Installation

1. Preparing for installation:

Before installing your ventilation hood:

  • Please read the instructions carefully.
  • Unpack the ventilation hood.
  • Ensure the voltage (V) and the frequency (Hz) indicated on the serial plate match the voltage and frequency of the installation site.
  • Check that the area behind the installation surface to be drilled is clear of any electrical cables or pipes etc
  • The ventilation hood surfaces can be damaged during installation if grazed or knocked by tools. Please take care to protect the surfaces during installation.
  • Protect the cooktop surface with cardboard, or the like, to prevent damage occurring whilst the ventilation hood is being installed above.
  • Temporarily mark the height of the bottom of the ventilation hood and the center of the cooktop on the wall according to the information given in the ‘Installation instructions – Height of ventilation hood’ section.
  • The wall used for mounting the ventilation hood should have sufficient strength and a flat surface.

 

2. Attach chimney brackets and ventilation hood mounting screws to the wall:

  • Attach the chimney bracket and upper chimney bracket (if using the upper chimney) in the locations shown in Fig.2 and Fig.3. Use the 1 3/16” (30 mm) screws (and expansion plugs if attaching to masonry).
  • Attach the upper ventilation hood mounting screws in the locations shown in Fig.2 and Fig.3. Using the 1 3/16” (30 mm) screws (and expansion plugs if attaching to masonry). Ensure that there is a 3/32” (2 mm) gap between the screw head and the wall (Fig.1).


Screen Shot 2018-01-04 at 10.17.54 AM.png
Fig.1

 

RH.JPG
Fig.2

Product Dimensions

inches (mm)

N. Lower ventilation hood attachment point width

20” (508)

O. Lower ventilation hood attachment point height

1 13/16” (46)

P. Upper ventilation hood attachment point width

9 7/8” (250)

Q. Upper ventilation hood attachment point height

11 3/8” (288)

R. Chimney bracket attachment point width

9 1/4” (235)

S. Chimney bracket attachment point height

24 1/4” (616)

T. Upper chimney bracket attachment point width

9 7/8” (250)

U. Upper chimney bracket attachment point height

1” (25)

RH1.JPG
Fig.3

 

3. Attach ducting adapter and power connection box to the ventilation hood:

  • Place the ducting adapter onto the ventilation hood and screw it in place using 13/32” (10 mm) screws.
  • Place the power connection box onto the ventilation hood and screw it in place using 13/32” (10 mm) screws.
  • Follow wiring instructions described in the ‘Electrical connection’ section.
RH3.JPG

4. Wall mounting:

 

  • Remove the filters – pull the relative catch and tilt the filter downwards until it disengages from the supports.

Screen Shot 2018-01-04 at 10.28.31 AM.png
  • Hang the ventilation hood off the upper ventilation hood mounting screws with 3/32” (2 mm) gap. Hang off the keyhole attachment points on the back of the ventilation hood then tighten the screws.
  • Attach the lower ventilation hood mounting screws to fix the ventilation hood to the wall.
  • Refit the filters.

Screen Shot 2018-01-04 at 10.29.11 AM.png

Electrical wiring must be done by qualified person(s) in accordance with all applicable codes and standards and the unit must be grounded.

5. Electrical connection:

  • Run three wires, two for the power supply and one for the ground wire, from the power connection box on the ventilation hood to a power connection point near the installation.
  • Open the power connection box on the ventilation hood and secure the power conductor with a strain relief (not included).
  • Connect the power conductors to the conductors for the ventilation hood, black to black and white to white.
  • Connect the grounding wire (green or bare) to the ground conductor (green) of the ventilation hood power connection box.
  • Secure all the connections with wire nuts.
  • Replace the power connection box cover.

RH4.JPG

6. Attach the ducting:

  • Attach ducting to the ducting adapter using aluminum duct tape and vent outside.

7.  Attach chimney:

  • Bend the tabs on the chimney (A).
  • Place chimney around the ventilation hood chassis and hang off the chimney bracket (B).
  • Extend the upper chimney and attach to the upper chimney bracket with 13/32” (10 mm) screws (C).

Screen Shot 2018-01-04 at 10.38.40 AM.png
A

Screen Shot 2018-01-04 at 10.39.00 AM.png
B

Screen Shot 2018-01-04 at 10.39.12 AM.png
C

8. Remove packaging:

  • Remove all packaging and protective wrappings.
  • Was this article helpful?