Skip to main content
Fisher & Paykel Product Help

Final Checklist

Lists the final checklist to be completed by the installer to verify safety and an optimal user experience.

2017-07-27_1638.png To be completed by the installer

  • Have the transit bolts been removed?
  • Is the drain hose threaded through the ‘U bend‘ (with no more than 20 mm extended) and hooked into your standpipe?
  • Is the hot hose connected to the Hot valve? Is the cold hose connected to the Cold valve?
  • Is the machine correctly levelled and feet locked? Have you performed the installation test cycle?
  • Was this article helpful?