Final Checklist
Lists the final checklist to be completed by the installer to verify safety and an optimal user experience.
To be completed by the installer
- Have the transit bolts been removed?
- Is the drain hose threaded through the ‘U bend‘ (with no more than 20 mm extended) and hooked into your standpipe?
- Is the hot hose connected to the Hot valve? Is the cold hose connected to the Cold valve?
- Is the machine correctly levelled and feet locked? Have you performed the installation test cycle?