Fit the Supplied Toekick Panel - DD60DA Models Only
Measure how high the toekick should be based on min. 12 mm clearance to floor and the table below. |
On a board, lay the toekick on its side and carefully score/cut down the corner to where the cutoff will be. There are 3 preset height positions. |
Once the sides are removed, score/cut all the way down the middle of the toekick. |
Carefully bend and snap off |
Using a hammer and screwdriver, punch out the two mounting hole locations as shown. Use a File to smooth the top edges. |
Mount the toekick into position over the cowling. Ensure the holes in the toekick match up with the mounting hole positions on the cowling. Push the two pins in to secure. Repeat on the opposite side.
|
Height from Floor to Bottom of Door (mm) | Number of Cutoff sections to Remove from Panel |
---|---|
100-114 | 3 |
115-129 | 2 |
130-144 | 1 |
145-160 | 0 |
If after fitting, the drawer touches the floor with a full load, you need to remove more of the toekick panel:
- Remove the lower drawer (see ALTERNATIVE METHOD (B) - SECURE BY DRAWER REMOVAL - STEP 8 B: REMOVE THE LOWER DRAWER)
- Remove the pins - use a pair of needle nose pliers to press the pin legs together and push back through the hole
- Remove the panel, and cut off another section of the kick strip following steps 2-8 above.
- Replace the drawer (see ALTERNATIVE METHOD (B) - SECURE BY DRAWER REMOVAL - STEP 11 B REFIT THE DRAWER ONTO THE RUNNERS)
- Continue from step 7 above.