To be Completed by the Installer
- Have the transit bolts been removed?
- Is the drain hose threaded through the ‘U bend‘ (with no more than 20mm extended) and hooked into your standpipe or spigot?
- Is the hot hose connected to the Hot valve? Is the cold hose connected to the Cold valve?
- Is the machine correctly levelled and feet locked?
- Have you performed the installation test cycle?
|