Skip to main content
Fisher & Paykel Product Help

Final Checklist

 

 

 To be Completed by the Installer

  • Have the transit bolts been removed?
  • Is the drain hose threaded through the ‘U bend‘ (with no more than 20mm extended) and hooked into your standpipe or spigot?
  • Is the hot hose connected to the Hot valve? Is the cold hose connected to the Cold valve?
  • Is the machine correctly levelled and feet locked?
  • Have you performed the installation test cycle?

 

Warranty_Service.PNG

 

 

 

 

  • Was this article helpful?